Skip to content

EPC · Transmission Lines · O&M · EV Infrastructure — Hyderabad & Pan India

Electrical Infrastructure for EV Charging Stations

Power augmentation, cabling and electrical works for 60 kW to 120 kW charging stations — already delivered in Telangana and Andhra Pradesh.

EV Infra Projects

From grid connection to charge point

A charger is only as good as the power behind it. You can install the best DC fast charger on the market, but without the right transformer capacity, cabling and protection, it simply sits there. We build the part of an EV charging station that nobody photographs and everybody depends on.

Everything on the power side

Our EV infra work covers load assessment, electrical design, transformer and panel installation, HT and LT cabling, earthing, metering and coordination with the local distribution company. We’ve already augmented electrical infrastructure for 60 kW and 120 kW charging stations across Andhra Pradesh and Telangana.

Whether you’re a charge point operator, an oil marketing company adding chargers at fuel stations or a property owner serving tenants, we fit the electrical design to how the site will actually be used.

Why it pays to get the power side right

Will your supply cope when every bay is in use at 7 pm? Undersized infrastructure leads to tripping, slow charging and drivers who don’t come back. Planning properly from day one avoids digging the same trench twice.

What You Gain

Our Services

Quick Enquiry

Need to talk it through?

Call +91 81427 60202 — Mon to Sat, 9:30 AM to 6:30 PM.

Products & Solutions

What we deliver under EV Infra Projects

Placeholder cards — replace the image, title and text with your own products, packages or solution sheets. Duplicate a card to add more.

DC Fast Charger Power Supply

Supply design and installation for 60 kW to 120 kW charging points.

Transformer & HT Panel Packages

Right-sized transformers, HT panels and protection for charging hubs.

LT Cabling, Earthing & Metering

Cable routes, earthing systems and metering ready for public use.

Charging Hub Load Planning

Site assessment and load studies with room for future chargers.

FAQ

Questions we hear often

Can’t find what you need? Call or WhatsApp us — an engineer will answer, not a call centre.

We’ve augmented electrical infrastructure for 60 kW and 120 kW EV charging stations across Andhra Pradesh and Telangana.

Yes. Coordination with the local distribution company for load sanction and metering is part of our scope.

We design with headroom — spare duct space, transformer margin and panel room — so adding chargers later doesn’t mean rebuilding the supply.

Charge point operators, oil marketing companies adding chargers at fuel stations, fleet depots and commercial property owners.

Let's Talk

Rolling out charging points?

Share your locations and target capacity. We’ll assess the power side of each site and tell you exactly what it needs before you commit to a single charger.

Call Now WhatsApp