Electrical Infrastructure for EV Charging Stations
Power augmentation, cabling and electrical works for 60 kW to 120 kW charging stations — already delivered in Telangana and Andhra Pradesh.
From grid connection to charge point
A charger is only as good as the power behind it. You can install the best DC fast charger on the market, but without the right transformer capacity, cabling and protection, it simply sits there. We build the part of an EV charging station that nobody photographs and everybody depends on.
Everything on the power side
Our EV infra work covers load assessment, electrical design, transformer and panel installation, HT and LT cabling, earthing, metering and coordination with the local distribution company. We’ve already augmented electrical infrastructure for 60 kW and 120 kW charging stations across Andhra Pradesh and Telangana.
Whether you’re a charge point operator, an oil marketing company adding chargers at fuel stations or a property owner serving tenants, we fit the electrical design to how the site will actually be used.
Why it pays to get the power side right
Will your supply cope when every bay is in use at 7 pm? Undersized infrastructure leads to tripping, slow charging and drivers who don’t come back. Planning properly from day one avoids digging the same trench twice.
What You Gain
- Stations that deliver their rated power, reliably
- Headroom to add chargers later
- Safe installations that pass inspection first time
- One partner for build and ongoing upkeep
Our Services
Quick Enquiry
Need to talk it through?
Call +91 81427 60202 — Mon to Sat, 9:30 AM to 6:30 PM.
What we deliver under EV Infra Projects
Placeholder cards — replace the image, title and text with your own products, packages or solution sheets. Duplicate a card to add more.

DC Fast Charger Power Supply
Supply design and installation for 60 kW to 120 kW charging points.

Transformer & HT Panel Packages
Right-sized transformers, HT panels and protection for charging hubs.

LT Cabling, Earthing & Metering
Cable routes, earthing systems and metering ready for public use.

Charging Hub Load Planning
Site assessment and load studies with room for future chargers.
Questions we hear often
Can’t find what you need? Call or WhatsApp us — an engineer will answer, not a call centre.
What capacity of charging stations have you powered?
We’ve augmented electrical infrastructure for 60 kW and 120 kW EV charging stations across Andhra Pradesh and Telangana.
Do you handle approvals with the DISCOM?
Yes. Coordination with the local distribution company for load sanction and metering is part of our scope.
Can the site be expanded later?
We design with headroom — spare duct space, transformer margin and panel room — so adding chargers later doesn’t mean rebuilding the supply.
Who do you work with?
Charge point operators, oil marketing companies adding chargers at fuel stations, fleet depots and commercial property owners.
Rolling out charging points?
Share your locations and target capacity. We’ll assess the power side of each site and tell you exactly what it needs before you commit to a single charger.