EPC for Transmission Lines and Renewable Power Plants
Engineering, procurement and construction for 132 kV to 765 kV lines and solar, wind and biogas plants — one team, one point of accountability.
Transmission Lines, 132 kV to 765 kV
When one company owns the engineering, the procurement and the construction, problems get solved instead of passed around. That’s the whole reason we run EPC work the way we do. You give us the scope and the deadline. We give you back an energised asset, tested and fully documented.
Overhead lines are where our team cut its teeth
Our scope covers route survey, tower spotting, foundations, erection, stringing, and testing and commissioning. We also take on the jobs many contractors avoid: completing balance works left half-done by others, diverting live corridors, and shifting overhead lines to underground cable inside busy private premises.
Why does that matter to you? A stalled line costs money every day it isn’t carrying load. We know how to get those projects moving again, and we’ve done it for state utilities and private developers alike.
Solar, Wind and Biogas Plants
On the renewable side, we install, test and maintain solar power plants, wind installations and biogas plants. Our engineers handle equipment installation, cabling, earthing, protection and grid synchronisation. After commissioning, we can stay on through maintenance, so generation holds up year after year rather than quietly sliding.
What You Gain
- A single point of accountability from design to handover
- Procurement planned around your schedule
- Safety and quality checks at every stage of work
- A team familiar with state utility standards and inspections
Our Services
Quick Enquiry
Need to talk it through?
Call +91 81427 60202 — Mon to Sat, 9:30 AM to 6:30 PM.
What we deliver under EPC
Placeholder cards — replace the image, title and text with your own products, packages or solution sheets. Duplicate a card to add more.

Lattice Towers & Stringing
Tower foundations, erection and conductor stringing for 132 kV to 765 kV lines.

EHV Underground Cable Systems
132 kV and 220 kV cable routes, terminations and overhead-to-underground transitions.

Solar Plant Balance of System
Module mounting, DC/AC cabling, inverters, earthing and grid synchronisation.

Wind & Biogas Plant Electricals
Installation, testing and protection for wind and biogas power plants.
Questions we hear often
Can’t find what you need? Call or WhatsApp us — an engineer will answer, not a call centre.
Which voltage levels do you handle?
Our transmission EPC work covers overhead lines from 132 kV up to 765 kV, including line diversions and overhead-to-underground shifting at 132 kV and 220 kV.
Can you complete a line another contractor left unfinished?
Yes. Completing balance works is something we’ve done for utilities — for example, the 15 km 132 kV line from the Shamshabad 220 kV substation to Thimmapur.
Do you work outside Telangana?
Yes. We’re based in Hyderabad and work across India, with project sites in Telangana, Andhra Pradesh, Maharashtra and Madhya Pradesh.
What do you need from us to quote?
Drawings or a route plan, the voltage level, line length or plant capacity, location and your target timeline. Tender documents help too.
Have a corridor to build or a stalled line to finish?
Send us the drawings and the timeline. We’ll return with a clear execution plan and a realistic view of what it will take to get you energised.